CSI_Week 06 (1st - 5th May)

Distribution Week 2!

A lot going on this week. We were given our final task list for each group.



My group mate, Aliya had arranged for a meeting with a group of sponsors. This included representatives from Development of Human Resources for Rural Areas(DHRRA), MEM Watches & CIMB Islamic.  

Aliya, Kenneth & I headed down to Nu Sentral mall to meet with them. We explained our cause, idea and showed them our proposal. We are really hoping for some good news from them.

 


Besides this, we also had distribution of food for this week. 

Menu 3 : Bolognese Pasta
Menu 4 : Aglio Olio















Comments

  1. Very significant Information for us, I have think the representation of this Information is actually superb one. This is my first visit to your site. Google Web Designer Florida

    ReplyDelete

Post a Comment

Popular posts from this blog

Built-In Furniture Detail Drawing

Bedroom Built-In Cupboard Plan View Front Elevation Drawing Section Drawing Blow Up 

Observation Detailing #1 : Wardrobe

 This is a timber wardrobe that is in my room. It is a two - sliding door wardrobe which also has two drawers. The detail drawing consists of a 3D view, a front elevation and also a blow-up detailing of how the sliding doors work. I know, it is pretty interesting ;)

CSI_Week 07 (8th - 12th May)

Finally our job scope! All the items were bought. All the packages were ordered. All our logos were printed. We needed to pack all of these items for 300 people! I managed to get help from 3 of my friends from other semesters to help us pack! This really helped us in fast production hehe :p     And after a few hours of continuous work, we completed all 300 kits! Next, it's time for distribution! :D